


Ponte o Rio Arade
Precast cantilever box girder bridge, two parallel decks, 550m length, 96m span. Complete design of all elements of the structure, finite element-modeling, precast elements geometric design, construction methods, launcher check, construction drawings and site follow-up.
Role: Structural Engineer
Client: Cintra
Employer:Ferrovial-Agroman
Portugal. 2002.
BUILT AND IN OPERATION
