M4/M6 – Kilcock to Kinnegad
35km, 33 structures, €255M. Design manager of all structures, construction methods, client management, consultant’s management: Arup and Hyder Consultants. Team: 1 Junior Engineer / 2 consultants.
Role: Structural Design Manager
Client: Cintra
Employer: Ferrovial-Agroman
Ireland. 2004.
BUILT AND IN OPERATION