by admin | Aug 28, 2025
Tunnel de Churriana Fire safety analysis of tunnel substructures. Heat modeling, structural analysis, spalling, fire protection design. Role: Structural EngineerClient: Ferrovial-AgromanEmployer: Arup Spain. 2011. BUILT AND IN...
by admin | Aug 28, 2025
Kuwait Airport, Package 3 Runways Project Manager on bid-design for runway rehabilitation and new construction in Kuwait International Airport. Capital cost circa €280 million. Role: Project ManagerClient: FCC/BurhanEmployer: Arup Farwaniyah, Kuwait. 2011....
by admin | Aug 28, 2025
Tappan-Zee Bridge Conceptual Design and Technical Specifications for the Tappan-Zee Bridge Replacement. ARUP Bridge Engineer team based in New York, Honk Kong, London, Madrid and San Francisco; including Naeem Hussain, Klaus Falbe-Hansen and Niels Jørgen Gimsing....
by admin | Aug 28, 2025
Oran Tramway Expert witness advice on a Dispute Settlement regarding concrete quality and delivery. The work was developed with Spain’s most relevant law firm (Uria y Asociados). Role: Expert Witness AdviceClient: Isolux – CorsanEmployer: Arup Oran, Algeria....