Edmonton LRT

Edmonton LRT Value Engineering for Stations and Bridges. Including elevated Stations; Extradosed 120m span bridge; 1.5km elevated guideway and other structures. Role: Structural Design ManagerClient: Dragados + FlatironEmployer: Fhecor North America Edmonton, Canada....

407 E – Phase 2

407 E – Phase 2 Bid Manager for Structure and Bridges. Over 100 structures, Value Engineer, BOQ and Peer Review. Role: Bid ManagerClient: DragadosEmployer: Fhecor North America Toronto, Canada. 2014....

Port Mann Highway-1

Port Mann Highway-1 Design of a cable stayed bridge, 425m main span, 865m total length, in collaboration with Michel Virlogeux. Design, finite element modeling, drawings, BOQ. Design of over 225.000m2 of structures, new and retrofit (including seismic retrofit of the...