Port Mann Highway-1

 

Design of a cable stayed bridge, 425m main span, 865m total length, in collaboration with Michel Virlogeux. Design, finite element modeling, drawings, BOQ. Design of over 225.000m2 of structures, new and retrofit (including seismic retrofit of the existing Port Mann Bridge Arch). External consultants: Klhon-Crippen.Berger, Amec.

 

Role: Structural Bid Engineer

 

Client: Cintra

 

Employer: Ferrovial-Agroman

 

Vancouver, Canada. 2007

Bids

Port Mann Highway-1

 

Design of a cable stayed bridge, 425m main span, 865m total length, in collaboration with Michel Virlogeux. Design, finite element modeling, drawings, BOQ. Design of over 225.000m2 of structures, new and retrofit (including seismic retrofit of the existing Port Mann Bridge Arch). External consultants: Klhon-Crippen.Berger, Amec.

 

Role: Structural Bid Engineer

 

Client: Cintra

 

Employer: Ferrovial-Agroman

 

Vancouver, Canada. 2007